中文
|
英文
|
日文
 
 
Keywords
 
search
Home About us Products Subcompany News Our Responsibility Personnel Content Us
 
 
  News
  Company news
  Industry news
  Media reports
 
 
The current position:Homecompany news  
 
Jiangsu guangxin photosensitive new materials co., LTD. 2013 annual environmental report
Add the time : 2017-1-10 14:13:00 source: The author: clicks:235

One, foreword

With the rapid development of social economy, environmental protection has become a major task faced by human society together.Due to long-term extensive economic growth mode of resources development and the comprehensive carrying capacity of natural resources and ecological environment limit approaching, intensified the contradiction between environmental protection and economic development.Therefore, economic development and environmental protection in harmony have become As the common focus of attention of the whole society, green low carbon development has become the consensus of the whole society.

Enterprises as the main power of social development, the main consumer of environmental resources and industrial "three wastes" of the main producers, duty-bound to become the backbone of the development of green economy.As influence companies of different industries, the company always adhere to the development of circular economy, do well the principle of clean production, efforts to build "a resource-conserving and environmentally friendly".Companies rely on scientific and technological innovation, on the one hand, constantly advancing technology, to develop the energy-efficient and environmentally friendly production technology, from the source to implement energy conservation and emissions reduction;Produced wastewater zero continue execution process on the other hand, the cooling water recycling, vigorously develop circular economy.Company through the establishment of environment management system and continuous improvement, not only effectively guide and promote the enterprise environment management scientific, institutionalized, and make the enterprise gradually achieve by the end of the management to the whole process of prevention and control, make the company's environmental performance is increasing day by day.

At the beginning of "twelfth five-year", the company has further improved the system of chemical industry environmental protection management, such as a number of environmental management system, by organizing all kinds of competition and training activities, strengthen the awareness of employees and energy saving, step by step decomposition energy conservation and emissions reduction targets, layers of implementation, to ensure the complete company "twelfth five-year" energy conservation and emissions reduction targets.

"Twelfth five-year" period, the company will further promote the environmental management system, continue to carry out clean production work, efforts to build a resource saving and environment friendly enterprise.To achieve this goal, the company will take the following measures:

1, to further establish and improve the environmental management system, complete environmental protection three system construction;

2, to further enhance the level of technology and equipment of energy conservation and emissions reduction;

3, to further strengthen environmental protection facilities operation management;

4, continue to promote circular economy, to ensure the effective operation of cooling water recycling project and the level of comprehensive utilization of waste materials;

5, and further to add strong staff team construction, strengthening the concept of environmental protection;

6, further optimize the environment management system, enhance the level of environmental management.

We hope that through the environmental report 2013, the company's environmental information system, transparent, truly convey to the public, let all stakeholders of the company to understand and support our environmental protection concept and action, in order to further promote the guangxin new materials of environmental protection energy conservation and emissions reduction.

Second, the company's basic situation

(a) company profile

1, company profile,

Jiangsu Kuangshun photosensitive new material co., LTD., is committed to development and production of high-tech and high grade new photosensitive material.Company after years of unremitting efforts, combined with foreign advanced technology and processes, the production of PCB ink has reached the technical level, conforms to the requirement of RoHS environmental protection directive, with excellent quality and excellent service is deeply trusted by customers, including apple iphone mobile phone manufacturer foxconn's approval.

Company passed the ISO9001 quality standard certification and ISO14000 environment system certification, is the national high and new technology enterprise.Company has achieved many honors, including: the Chinese photographic society of professional committee of the radiation curing, deputy director of the unit, the ninth national committee, deputy director of the printed circuit branch of unit, the national standardization technical committee, deputy director of the unit printed circuit boards, printed circuit industry in China in the second session of "nation" brand enterprise, jiangyin in 2011 advanced units of ecological construction and environmental protection, etc.

Companies always adhere to the science and technology as the first productivity.Enterprise technology center in wuxi city, the company has built in wuxi city, and form a complete set of PCB ink research and development of engineering technology research center, two platform, and lead to make the printed circuit with marking ink and the printed circuit using resistance solder "two important industry standards.The company's flagship product, solder resist ink (solder mask) KSM - S6188 series, KSM - 180 series of products have been American UL safety certification.

Company pays attention to "production" development, and actively with the Beijing university of chemical, wuxi chemical industry design institute, China university of science and technology and other domestic famous universities and colleges for a wide range of technical exchanges and cooperation, and jiangnan university as early as in early 2007 the company set up a joint laboratory of the college of polymer materials.After recent years of scientific research cooperation, the company has built an independent intellectual property rights system, including 5 patents of invention and utility model patents 15.Now the company except based laboratory equipped with advanced facilities, more condensed the doctor, master as the core, the research and development ability strong professional technical team.

Over the years the company with scientific management mode and perfect quality system of production and business operation and development, and strive to develop the international market, to ensure our broader development.The company all staff is willing to take "pioneering and innovative, pragmatic and efficient" spirit of enterprise and "quality win, customer first" business philosophy, and constantly improve the innovation, to meet customer requirements, improve the ability of enterprise in market competition both at home and abroad.

2, the geographical position is superior

Jiangsu Kuangshun photosensitive new materials co., LTD., located in the town of jiangyin qingyang industrial park, east tin chengcheng expressway, shanghai-nanjing high-speed, high-speed tin road, along the Yangtze river in the north, west near the beijing-hangzhou grand canal, to wuxi jiangnan airport just half an hour, the traffic is very convenient.

3, company corporate culture

Purpose: honesty, cooperation, development and win-win.

Vision: after five years of efforts, the realization of new photosensitive materials of 20000 t/year of production scale, bend force to build the world's largest one of new photosensitive materials production, research and development base.

Core values: development, value and service to our country enterprise.

(2) the company structure

The company is a limited liability company.

Company organization Settings: see below
Three, the environmental management

(a) environmental protection concepts

Environmental protection concept: green environmental protection, employees health and social satisfaction.

Environmental policy: focus on the natural environment, the implementation of saving energy and reducing consumption, is committed to pollution prevention and control, to create green engineering

Main contents:

To create green engineering: it is adapt to the nature of the production, making the commitment to the public.Which abide by the laws, regulations and other requirements, adhere to establish economical enterprise development concept, in the whole process of scientific research, production, saving energy and reducing consumption, prevent and control pollution, continuous improvement and prevention and control of pollution and make our products constantly to meet environmental requirements, establish ecological park, to adapt to the company development scale, continuously improve environmental performance.Create the harmony of man and nature are all members of the company for the long-term development of the company, the vision of unremitting struggle.

(2) environmental management organization and environmental goals

1, the environmental management organization

Guangxin attaches great importance to environmental protection, new materials, established the perfect environmental protection organizations set up by the general manager as a leader of the environmental management team, management, specifically responsible for the company's environmental protection and energy conservation and emissions reduction work, currently engaged in environmental protection, energy conservation and emissions reduction of professionals, part-time staff 10 people, among them, with environmental protection professional qualifications of senior engineering and technical personnel 2 people.

In 2009 the company carried out ISO14001 environmental management system and establish a comprehensive, jitc work, in order to ensure the system's effectiveness, the company carried out at least once a year internal audit activities, to find problem timely rectification, no hidden dangers.

In the process of environmental management system, company manager, general manager of the first persons responsible for environmental protection, in charge of the whole company's environmental protection work, rules departments implement environment management system of responsibility and authority, division of labor cooperation, according to implement and maintain effective environmental management system.

Management representative is responsible for organizing to establish environmental strategy, the environment development planning and environmental target, supervise and control to the company all environmental management institutions.

Each unit "security environmental protection liaison" is responsible for the daily monitoring of the environmental protection equipment maintenance, and data processing, etc. All the work.

2, the company environmental protection goal

Short-term goal (2013) : in accordance with the relevant regulations and standards emissions;Emissions and the concentration of COD in line with the requirements of national standards and local government;"Three simultaneity" construction projects environmental impact assessment, rate of 100%;

Long-term goal: to actively carry out clean production and so on advanced theory and mechanism of environmental protection, completes the whole process from the source of pollution control, strive to make the company in 2020, the comprehensive energy consumption and pollutant emissions in the domestic advanced level, in 2049 the company comprehensive energy consumption and pollutant emission level at the international leading level.

(3) of the environmental management system

At present, the company has been set up and improve the various environmental management system.Successively formulated the "guangxin new material company environmental management rules and regulations, the safety assessment of environmental rules, such as a number of environmental management system for the normal work of daily environmental protection laid a solid foundation.

(4) enterprise mainly producing pollution, pollutant treatment facilities

1, the pollution factors, facilities and processes

Company in 2013 normal blowdown.Production without using the technology of wastewater, domestic wastewater in accordance with the relevant regulations and standards to take over to source through sewage treatment plant;Emissions and the concentration of COD in line with the requirements of national standards and local government;Production of solid waste entrust a qualified processing center of jiangyin city solid waste incineration, solid waste is not put deposited in the open air;4 workshop to produce a small amount of organic waste gas, through a more than 15 meters high altitude discharge after activated carbon adsorption device.Dispersion containing dust exhaust gas produced by the gas collecting cover collection, and adopts two sets of cloth bag dust collector, after processing by 2 root 15 m high vent emissions standards.Particulate matter organized emissions reach Beijing local standards "integrated air pollutant discharge standard" (DB11/501-2007) Ⅱ time values in table 1.The total hydrocarbon organized methane emission rate and the highest emission concentrations reach Beijing local standards "integrated air pollutant discharge standard" (DB11/501-2007) Ⅱ time values in table 1 and table 2.The total hydrocarbon fugitive methane emissions reach Beijing local standards "integrated air pollutant discharge standard" (DB11/501-2007) the unorganized emission concentration limit in table 1.

2, environmental protection investment

In 2013, Kuangshun environmental protection infrastructure and management of environmental protection investment 2.02 million yuan, 14000 tons of content involves expansion project waste gas purification engineering machine with new with old engineering environmental protection facilities, environmental assessment, acceptance, etc.

In 2013, the company's main environmental protection investment project is: workshop exhaust gas purification systems engineering, emergency accident building environment protection facilities, the initial rainwater collection pool, pool running cost, construction construction fee, waste disposal charge, environmental monitoring, internal and external environmental protection training and environment management system operating cost, etc., combined environmental protection investment about 2.127 million yuan.

(5) the company attaches great importance to clean production and environmental protection work, and in 2013 adopted a lot cleaner production measures jamie had high fee.Based on the reality and long-term development of the enterprise, adheres to the principle of continuous healthy development, through the production process, the material, the adjustment of production equipment, has reached the requirement of clean production, and passed the acceptance of clean production, improve the environmental management process, to establish the long-term effective mechanism of environment management, achieved superior environmental performance.

1, advancing technology transformation, the implementation of energy conservation and emissions reduction from the source

In 2013, the company according to their own actual, from the sources of energy, resources, raw materials consumption and production technology process analysis, such as continuous tracking production each link and key parts of the generation of waste, energy consumption and so on, for each link of resources, product yield and waste of energy utilization for detailed statistics, formulate the scheme can reduce pollution, through the establishment of the ERP management system in time, regular inventory loss of material and energy consumption, effectively save water, electricity, the use of raw materials, to a certain extent, improve the economic benefit, reduces the environmental risk.

2, to strengthen the construction of environmental protection treatment facilities and radically reduce the emissions

Implement expansion project in the eia report "to the new with the old" measures, for new and original items scattered workshop, polishing workshop and packing workshop main equipment shall be set inside the gas-collecting hood exhaust from collection of organic waste gas and dust to scattered in the workshop, polishing workshop and packing workshop main equipment has been installed the gas-collecting hood and gas collecting pipe and fan, exhaust gas after collection with 4 sets of activated carbon adsorption treatment device, by four 15 m high vent standards;Dispersion containing dust exhaust gas produced by the gas collecting cover collection, and adopts two sets of cloth bag dust collector, after processing by 2 root 15 m high vent emissions standards.

Companies in strict accordance with the principle of "clean-up shunt, rain sewage diversion", the construction of the factory water supply and drainage system.Mainly for the domestic sewage, wastewater after pretreatment by septic tank access jiangyin yuantong comprehensive sewage treatment co., LTD focus on standard after discharge.In the factory the rainwater drains already set cut-off valve and control well, and is equipped with 240 m3 accident emergency and fire water collection pool, pool to prevent leaking material, fire control and drainage, and the early rain outside.

The sound insulation, noise elimination, set within the building, the reasonable layout and other measures to reduce the effects of noise on the surrounding environment.By monitoring, the execution of noise at boundary of the emission of environmental noise within the boundary of industrial enterprises "(GB12348-2008) in table 1 3 class standard.

3, pay attention to management, to saving energy and reducing consumption to benefit

Company constantly changing ideas on management, establish sustainable notions and save resources, protect the environment responsibility consciousness, explore the effective mechanism of resource management and comprehensive utilization, make limited resources to get the greatest efficiency.

Since 2010, the company gradually change the floodlight to energy-saving lamps, the new increase the flare path of the road, in addition to the special process requirements, are all made of both energy saving and environmental protection energy-saving lamps, all production equipment equipped with frequency converter.

In office area fine diameter ZhiGuanXing fluorescent lamp, electronic ballast used to try to use natural light, less open lamp, put an end to hers.So save energy, and reduce the noise, also improved working environment.At the same time, the company actively apply new energy conservation techniques, install the constant pressure variable frequency converter in the water supply system, better solve the peak in the water and the disadvantages of slack when the control is not scientific, overcome the "big horse-drawn cart" phenomenon, to ensure the production and living water, at the same time, achieve the goal of the water and electricity saving.

(6) environmental education and training

Company always attaches great importance to environmental protection management standards and the environmental protection personnel related training.Company with national relevant laws and regulations, environmental management system and internal environmental management documents as the basis, all environmental protection related requirements management regular learning, and learning effect should be brought into the post evaluation, guarantee the stable operation of the environmental protection facilities, improve the related personnel's professional skills and management level.To full-time environmental management personnel, training and assessment.In order to ensure the stable operation of the environmental protection facilities, improve the environmental protection work personnel's professional skills and management level.On the basis of the future trend of the development of enterprise, the company organization staff to stable cross ISO14001 standard requirement.And set up the environment management manual, environmental management procedures and work instructions, etc., in the company-wide stable cross, the environmental protection consciousness to enhance the general employees.Company according to the requirement of system documents environment policy, policy launched a series of activities: identification of environmental factors and important environmental factors, the identification of the applicable laws and regulations, formulate environmental target index management solutions, evaluate compliance, promote energy conservation and emissions reduction activities, etc., has obtained certain environmental management performance, make the environmental awareness of all employees.

Four, to obey the law of environmental protection

(a) environmental impact assessment and the system of "three simultaneity" implementation

Company projects are strictly implement the system of environmental impact assessment and the "three simultaneity", the company expansion construction project eia and the "three simultaneity" have successfully passed the acceptance of the relevant departments.

(2) of pollutants discharging standard and the status of disposal

2013 annual company for waste water, waste gas, the standard of noise at boundary of monitoring, the summary is as follows.

1, the waste gas monitoring

(1), jiangsu Kuangshun photosensitive new material co., LTD., vent dispersed after grinding process monitoring results show that the particle emission concentration of 9.22 mg/m3 (the state), discharge rate of 0.04 kg/hour, reached the DB11/501-501 "comprehensive atmospheric pollutant discharge standard" Ⅱ time values in table 1.

(2), jiangsu Kuangshun photosensitive new material co., LTD., let dissolve, vent premixed process monitoring results show that the total hydrocarbon emissions of methane concentration is 0.47 mg/m3 (the state), discharge rate of 0.016 kg/hour, reached the DB11/501-501 "comprehensive atmospheric pollutant discharge standard" Ⅱ time values in table 2.

(3), jiangsu Kuangshun photosensitive new materials co., LTD. Should the premixed, dissolving process vent monitoring results show that the total hydrocarbon emissions of methane concentration is 0.75 mg/m3 (the state), discharge rate of 0.006 kg/hour, reached the DB11/501-501 "comprehensive atmospheric pollutant discharge standard" Ⅱ time values in table 2.

(4), jiangsu guangxin photosensitive new material co., LTD. Factory bound monitoring results show that the methane non-organization waste gas discharged from total hydrocarbon concentration point to a maximum of 1.19 mg/m3 (the state), reached the DB11/501-501 "comprehensive atmospheric pollutant discharge standard" unorganized emissions standards in table 1.

2, noise monitoring

Jiangsu Kuangshun photosensitive new materials co., LTD., the noise monitoring results report attachment, monitoring results show that the site of Z1, Z2 day day and night noise at boundary of reached GB12348-2008 "standard of environmental noise at boundary of industrial enterprises discharge" in table 1 3 class standard;Z3 sensitive day and night noise are reached the site of GB3096-2008 "standards for acoustic environmental quality" in table 1 2 class standard.

(3) the environmental risk management system set up and run

Company established the environmental risk hidden under special organizational structure, established the emergency response procedures, established a "hazardous waste pollution emergency environmental accidents emergency plan, the fire emergency plan and emergency environmental accidents emergency plans, and have been in accordance with the requirements for the emergency response procedures on a regular basis practice and evaluation.

Company set up by the general manager for leader of sudden environmental emergency handling leading group, leading group consists of office, and with other members of the scene to form the complete information network.Environmental management emergency leading group as below:

Jiangsu Kuangshun photosensitive new materials co., LTD. Environmental management leadership team

Five, the manual

(a) this annual environmental report covers all relevant departments and units;

(2) the environmental report report deadline for January 1, 2013 to December 31, 2013, released on January 2, 2014.

(3) staff and contact information

Unit: jiangsu Kuangshun photosensitive new material co., LTD

Telephone: 0510-68821659 E-mail: 18306163625 @163.com

(4) information feedback

If you have any questions or comments in this report, welcome your letter and inquire.

1, the incoming letter consultation address: jiangyin city, jiangsu province green YangZhenHua chengyang road on the 18th

2, contact: tel: 0510-68821659 fax: 0510-86915301;The email address 18306163625 @163.com.

Six, the concluding

Jiangsu Kuangshun photosensitive new material co., LTD will always stick to the road of harmonious development, together with the environment by improving production process, strengthen environmental protection management level, further enhance the company cleaner production ability, do what needs to be the social responsibility of environmental protection, realize the sustainable development of green economy, and continue to strengthen the environmental information disclosure work, make the social public and the government understand the status of environmental protection enterprises.

 
 
Home
Brief Introduction
Organization Chart
History
Honor
Enterprise Culture
CEO mailbox
Workers Home
Products
Products Center
Solution
Customer service center
Join in
Subcompany
Subcompany
Affiliated Enterprise
News
Company News
Material news
Material news
Media report
Employees care
Social public welfare
Environmental protection
Personnel
Talent strategy
Social recruitment
Campus recruitment
Contact us
Campus recruitment
Email
 
 
JIANGSU  KUANGSHUN  PHOTOSENSITIVITY  NEW-MATERIAL STOCK  CO., LTD  All rights  |   Guangdong ICP for 08031020